Knockdown rebuild

Knockdown rebuilds in Werribee and Melbourne’s west.

Love your street but not your house? Replace it with a new, efficient home without leaving the neighbourhood.

Knockdown rebuild

A new home on the land you already own.

A knockdown rebuild replaces an older or tired house with a brand-new home designed around how you live now. You keep your location, neighbours, schools and commute, without the costs of selling, buying and moving, such as agent fees and stamp duty on a new purchase.

BuildTune manages the whole process: site review, design coordination, demolition approvals, construction and handover, with one point of contact throughout.

A good fit if:

  • Your home needs major repairs, re-stumping or rewiring
  • The layout no longer suits your family
  • Your block could fit a larger or more efficient home
  • You are considering two homes on one lot instead of one
Timber frame of a new home during a knockdown rebuild in Werribee
How it works

How a knockdown rebuild project works with BuildTune.

  1. 01Site review

    We check your title, covenants, easements, overlays, services, access and soil so the design suits the block.

  2. 02Design and approvals

    Your design is finalised with engineering and energy ratings, then building permits are arranged, plus a planning permit if an overlay requires one.

  3. 03Demolition

    Services are disconnected, any asbestos is removed by a licensed removalist, and the old house is demolished under its own permit.

  4. 04Build and handover

    Construction is managed stage by stage with regular updates, then final inspections and handover of your new home.

Approvals in Victoria

What the rules say.

  • A building permit is required to demolish a house, and council report and consent is usually needed when a whole building is demolished.
  • Homes built before 1990 may contain asbestos, which must be identified and safely removed by a licensed asbestos removalist before demolition.
  • Heritage and other planning overlays can mean a planning permit is also needed. We check this during the site review.
  • Builders must be registered with the Building and Plumbing Commission (BPC) for domestic work over $10,000. For contracts signed from 1 July 2026, Home Warranty insurance applies to eligible domestic building work over $20,000 (contracts signed earlier were covered by Domestic Building Insurance above $16,000).

General information only. Requirements depend on your property; we confirm them for your site.

What affects the cost

Demolition and any asbestos removal

Site costs: soil class, slope, retaining walls and access

Disconnecting and reconnecting services

Temporary accommodation while you build

Home size, design and selected inclusions

FAQ

Knockdown rebuild: common questions.

Do I need a permit to demolish my house in Victoria?

Yes. Demolishing a house needs a building permit, and council report and consent is usually required when the whole building is demolished. We look after these approvals as part of the project.

Is a knockdown rebuild cheaper than buying a new home?

It can be, because you avoid selling and buying costs such as agent fees and stamp duty on a new purchase. The answer depends on your block, demolition costs and the home you build, so we provide a clear breakdown after the site review.

How long does a knockdown rebuild take?

It depends on approvals, design, the size of the home and site conditions. We give you a realistic timeline for each stage after the site review, before you commit.

Where do I live during the build?

Most owners rent nearby or stay with family. Factor this into your budget; we will give you the expected timeframes so you can plan.

Can I build two homes instead of one?

Often, yes. Many blocks suit dual occupancy, subject to zoning, lot size, covenants and a planning permit.

Planning a knockdown rebuild project?

Call or WhatsApp +61 416 801 313 or send an enquiry for a free, no-obligation discussion.

WhatsApp Call Email